ASSET is serving as the prime contractor for the design and construction of a 22,927 square foot School Age Center (SAC) to serve children ages
ASSET served as prime contractor for the design and construction of a 7,868 square foot C-17 Maintenance Training Facility to provide tools and classrooms to
ASSET served as the prime contractor for the design and construction of an 18,280 square foot Central Receiving Warehouse to accommodate logistics and administrative operations,
ASSET served as prime contractor for the design and replacement of the southwest hangar door on Building 3102. For the hangar to accommodate additional types
ASSET performed full-scale asbestos, lead-based paint and hazardous materials surveys to include mold and hazardous waste characterization, covering 13 states, including Oklahoma, Texas, and Louisiana
ASSET served as prime contractor for the design and construction of the 5-story Federal Pensacola Courthouse, which included investigation of construction deficiencies, design and construction
ASSET provided microbial remediation for 39 rooms in 6 occupied buildings due to mold damage caused by Hurricane Ivan. Containment areas were clearly established and
ASSET served as prime contractor to replace the existing monorail track, trolley duct, hoist trains and controls with newly constructed, reinforced structural framing to support
ASSET served as prime contractor for the new construction of a Mechanical Breathing Air System. The project required close coordination with building users to minimize
ASSET served as the prime contractor assisting The Irvine Company’s transition into developing its own environmental programs and management services. Over a five year period,
ASSET performed a Indoor Air Quality (IAQ) investigation for Devon Energy’s occupied office space on the 7th and 20th floors of the Chase Bank Building.
Within 24 hours, ASSET deployed to respond to those affected by Hurricanes Katrina and Rita. ASSET provided generators, living supplies, potable water, and ablution services.
ASSET performed the assessment and remediation of mold in the air handling units and the associated supply and return registers for the Encinitas Campus for
ASSET served as prime contractor for the design and installation of a fabric vertical-rising hangar door with two emergency egress doors. The project required select
ASSET served as prime contractor for the demolition of Building 2101, a 50-year old vehicle maintenance facility referred to as the “Sawtooth” Building. The project
ASSET served as prime contractor for the design and construction of the Hangar Doors at Building 240. The new hangar doors were designed to look
ASSET served as prime contractor to provide post-Hurricane Katrina emergency response, remediation and reconstruction of Series 460 and 470 Bachelor Enlisted Quarters (BEQ’s) at NAS/JRB
ASSET served as prime contractor to perform a comprehensive asbestos survey of manholes and 14 buildings encompassing 359,362 square feet. Upon completion of the survey,